Main phases of repair in the home

Main phases of repair in the apartment.

How to start repair works of the apartment?

The first phase of the repair work of old homes is the destruction and dismantling to start with of the dilapidated walls and partition walls, getting rid of the wall and ceiling covering. This stage is among the most "dirty" stages of the repair.

One more among the most crucial and "dusty" works is the window block replacement. It is needed to do this first of all because dirt and dust will be unallowable during following stages and it is restricted at all to open windows throughout painting and wallpaper works (large drops of the temperature and wetness are unallowable). After installing windows and windowsills it is essential to load them immediately in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).

The following stage is circuitry. Electrical wiring can be installed in walls or along the floor. Wiring is made inside the pipes to make sure electrical security and boost reliability. The pipe protects wiring from external damages and enables to change the wire completely without breaking walls and flooring merely by inserting the new wire rather of the old one.

House Painting follows the wiring. The frequent mistake during the simultaneous conducting of such works takes place when employees forget to set out one of the cables and home painters have actually currently plastered and smoothed out the wall. As a result, additional works are needed to seal chases on the completed wall. The places of the feed switch and wall outlet place and their number need to be thought-out in advance. The plan of power wiring is normally consisted of into the style project.

Later on the system need to be prepared to service in case of failures. In addition to the circuitries, the telephone cable and the television cable are laid out. The power cable television ought to not be laid out near the telephone and antenna cables to avoid sound pickup and interference. The most strange minute is laying out the TV cable television. In order to make 2 (or 3) television set in the apartment or condo the second cable is often just "firmly soldered" in parallel, so the cable resistance is reduced. As an outcome, the display quality is weakened, lots of programs can't be gotten and etc. In order to avoid such situation it is necessary to welcome a professional with unique devices. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is performed concurrently in all premises, if it is possible. Delays are linked with the innovation. Each applied layer of the plaster (or filling out ending up) must dry completely before the work will continue.

Works in hygienic arrangements and the kitchen area begin at the same time with home painting. It is much better to satisfy so-called "unclean" operate in the first place and simultaneously. In accordance with the strategy of the sanitary specialist place welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.

Then works in hygienic arrangements are conducted according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is assembling ceiling and laying tiles on the flooring. home repair safety practices And at last other hygienic gadgets, mixers and devices are mounted.

After electrical wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up during this phase in order to save their surface area look. The surface puttying of walls is performed simultaneously. The technically precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines wetness of the material.

The following stage is the process of fill. Fill can be made with different products-- from usual masonry cement-sand mix to self-aligning floors. The advantage of the easy mix is its cheapness, the drawback is that such mixture is much more difficult aligned at the level and the last dry time of such fill is 40 days, only then the next stage of the work with floor can be performed, i.e. the duration is too long. Self-leveling self-aligning floorings are much more costly, however more technological. Lining up takes place almost "instantly" i.e. fluid solution of mixture is poured out, then it runs and you receive the horizontal surface area. The last dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "wet processes" are inapplicable the innovation of the dry aligning (the fill innovation) is used bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Setup of doors must take into the account thickness of future floor covering. After setup the door can be taken off its hinges and got rid of till completion of repair or packed into polyethylene movie to protect from damages. Simultaneously ceiling can be painted and the tile can be laid in that properties where it was planned. The tile should be laid on the definitely dry overlay.

Finishing of the flooring mounting depends upon the prepared covering. Most of the times (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood gives the additional heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.

In premises where finish covering of the floor is laminated flooring or parquet hoard, the common wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed repercussion is connected just with such rushing process when the fantastic quantity of dust is developed. In spite of the fact that good flooring grinders are equipped with the vacuum cleaner, the adequate quantity of dust is precipitated on surrounding topics including walls. Dust is really acerbic and is severely cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be considered to be finished. It is left only to install the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

image

In conclusion it is necessary to keep in mind that the sequence of works was listed in general and can change depending on the definite scenario-- the variety of rooms in property, your resources, peculiarities of the building and construction of the multilevel properties. It is based on sound judgment and every person capable of analysis can individually create such a series.